Design, Installation and operation of a 38.95MWp DC ground-mounted photovoltaic solar system, 30MW AC delivery and a 30% lithium BESS backup system for 4 hours in Naco, Cortés.
Design, Installation and operation of a 38.95MWp DC ground-mounted photovoltaic solar system, 30MW AC delivery and a 30% lithium BESS backup system for 4 hours in Naco, Cortés.
Complete the form to download this resource.
Tegucigalpa: seguimiento@cni.hn | (504) 2242-8955
San Pedro Sula: oficinasps@cni.hn | (504) 2561-6100 ext 109
Tegucigalpa: Government Civic Center, Tower 1, Level 12.
San Pedro Sula: Chamber of Commerce and Industry of Cortés, Las Brisas neighborhood, 22nd and 24th streets between 1st and 4th Junior Avenue.
© Copyright 2024 CNI Honduras – All rights reserved.